Since 2004 Glass Water Systems has been a leader in Economical Water Treatment. Residential, Commercial, and Industrial Water Treatment Products. BEST PRICES GAURANTEED

Brine Tank / Salt Tank Setting Instructions

Brine Tank / Salt Tank Setting Instructions
**DOWNLOAD THE LINK BELOW FOR BRINE TANK / SALT TANK SETTINGS ON YOUR CONTROL VALVE**









SET UP FOR SXT Look for the BLFC (Brine Line Flow Control). This is either located on the Valve Sticker on the Faceplate of the valve where the serial number is or on a sticker where the brine line comes into the valve. You want to use the chart on page one to determine how much water you need to put into the brine tank. Example: 32,000 grain water softener with a BLFC of .5 gpm. Requires 18lbs of Salt 18l/s of Salt / 3lbs per gallon = 6 Gallons of Water 6 gallons of water/ .5 GPM BLFC = 12 minutes You will set this up in Regeneration Cycle Step Times in the BF Cycle Step

SET UP FOR NXT Look for the BLFC (Brine Line Flow Control). This is either located on Valve Sticker on the faceplate or on the In Line BLFC that is attached to the valve (fig 1) You want to use the chart on page one to determine how much water you need to put into the brine tank Example: 300,000 grain water softener with a BLFC of 2 gpm. Requires 150lbs of Salt l/s of Salt / 3lbs per gallon = 50 Gallons of Water 50 gallons of water/ 2 GPM BLFC = 25 minutes You will set this up in the Regeneration Cycle Steps in the Brine Tank Fill

SET UP FOR ELECTROMECHANICAL Look for the BLFC (Brine Line Flow Control). This is either located on the Valve Sticker on the Faceplate of the valve where the serial number is or on a sticker where the brine line comes into the valve. Or on the BLFC attached to the valve shown on page 2 Fig 1 You want to use the chart on page one to determine how much water you need to put into the brine tank. Example: 32,000 grain water softener with a BLFC of .5 gpm. Requires 18lbs of Salt 18l/s of Salt / 3lbs per gallon = 6 Gallons of Water 6 gallons of water/ .5 GPM BLFC = 12 minutes Now you will set this on program wheel for regeneration cycle shown in Fig 2. The number of spaces between the rapid rinse and the last two pins on the wheel in the brine fill. In the example above you would leave 6 open holes between the rapid rinse and last two pins

Call us with any questions at:

Ph#: 813-626-9498 Toll Free: 1-877-345-2770